Skip to content
Foxwyn Global Assurance LLP

Green Buildings

What to Prepare Before Starting a Green Building Assessment

The earlier sustainability enters the design, the more credits remain achievable. Gather these inputs before your feasibility review.

General guidance under technical review — not an official regulatory update. Always confirm current requirements with the applicable authority.

Feasibility reviews for IGBC, GRIHA or LEED are only as good as the information available. These inputs help a consultant give a realistic picture.

Project basics

  • Location, site plan and area statement
  • Building use and occupancy
  • Current project stage
  • Target rating and business driver

Design information

  • Architectural drawings
  • MEP concept or design
  • Façade and glazing details
  • Landscape plan

Performance data

Any energy, water or daylight studies already completed — and for existing buildings, 12 months of utility data.

Team and timeline

List consultants, contractors and key dates so responsibilities can be assigned to each credit.

Let’s turn your requirements into a clear action plan.

Tell us about your organisation, product or project. Our team will help define the scope, documentation needs and next steps.

Prefer to talk? +91 6261295002
Chat with Foxwyn on WhatsApp